DISTRICT 01

 DOCKET NUMBER
 STYLE OF CASE
01-0249841
PFD

ORDER
APPLICATION OF REGENCY FS LP TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, THE BIGFOOT EXTENSION, FRIO COUNTY, TEXAS.
01-0250295
PFD
ORDER
APPLICATION OF REGENCY FS LP TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, THE VIRTEX EXTENSION, FRIO COUNTY, TEXAS.
01-0252639
PFD

ORDER
APPLICATION OF REGENCY FS LP TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, THE FLASHING TO DELTA EXTENSION, ATASCOSA AND MCMULLEN COUNTIES, TEXAS.
01-0268566
PFD
ORDER
APPLICATION OF CHESAPEAKE MDSTRM DEV, L.P. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, DILLEY SOUR GAS GATHERING SYSTEM, FRIO COUNTY, TEXAS.
01-0268567
PFD
ORDER
APPLICATION OF CHESAPEAKE MDSTRM DEV, L.P. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, FOX CREEK SOUR GAS GATHERING SYSTEM, LA SALLE COUNTY, TEXAS.
01-0268790
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEV, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, FOX CREEK DISCHARGE LINE, MCMULLEN COUNTY, TEXAS.
01-0269359
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, WHEELER TRUNKLINE, FOX CREEK GGS AREA, MCMULLEN COUNTY, TEXAS.

01-0269360
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, FOX CREEK TRUNKLINE, FOX CREEK GGS AREA, MCMULLEN COUNTY, TEXAS.
01-0270135
PFD
ORDER

APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, STRAIT TRUNKLINE, DILLEY GGS AREA, LA SALLE AND DIMMIT COUNTIES, TEXAS.

01-0270136
PFD
ORDER

APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, LIGHT TRUNKLINE, DILLEY GGS AREA, LA SALLE COUNTY, TEXAS.

01-0270864
PFD
ORDER

APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, JEA TRUNKLINE, DILLEY GAS GATHERING SYSTEM, LA SALLE COUNTY, TEXAS.

01-0271305
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, BURNS RANCH LATERAL, FRIO GAS GATHERING SYSTEM, LA SALLE COUNTY, TEXAS.
01-0271380
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, JJ HENRY LATERAL, FOX CREEK GAS GATHERING SYSTEM, MCMULLEN COUNTY, TEXAS.
01-0271304
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, LAMMERTS LATERAL, DILLEY GGS AREA, LA SALLE COUNTY, TEXAS.
01-0271812
PFD
ORDER
APPLICATION OF ENERGY TRANSFER COMPANY TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, CHEYENNE PIPELINE, LA SALLE & MCMULLEN COUNTIES, TEXAS.
01-0272348
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, ZIENTEK LATERAL, DILLEY SOUR GAS GATHERING SYSTEM, DIMMIT COUNTY, TEXAS.
01-0272349
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, VERHEUL TRUNKLINE, DILLEY SOUR GAS GATHERING SYSTEM, DIMMIT AND ZAVALA COUNTIES, TEXAS.
01-0274758
PFD
ORDER

APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE WESTWIND LATERAL PIPELINE, DILLEY GAS GATHERING SYSTEM, ZAVALA COUNTY, TEXAS.

01-0275045
PFD
ORDER

APPLICATION OF CHEYENNE ENERGY SERVICES LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE AULD SHIPMAN GATHERING SYSTEM, EAGLEVILLE (EAGLE FORD-1) FIELD, LA SALLE COUNTY, TEXAS.

01-0279074
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, PEACOCK INTERCONNECT PIPELINE, EAGLEVILLE (EAGLE FORD-1) FIELD, MCMULLEN COUNTY, TEXAS.
01-0280578
PFD
ORDER
APPLICATION OF CHESAPEAKE MIDSTREAM DEVELOPMENT, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, FRIO DILLEY INTERCONNECT PIPELINE, DILLEY SOUR GGS AREA, LA SALLE COUNTY, TEXAS.
01-0282448
PFD
ORDER
APPLICATION OF ACCESS MIDSTREAM OP., LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, AVANT LOOP PIPELINE, DILLEY RICH GGS AREA, LA SALLE COUNTY, TEXAS.
01-0284945
PFD
ORDER
APPLICATION OF PIONEER NATURAL RES. USA, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE WEST 12 INCH SOUR GAS PIPELINE, EAGLEVILLE (EAGLE FORD-1) FIELD, LA SALLE COUNTY, TEXAS.
01-0285155
PFD
ORDER
APPLICATION OF PIONEER NATURAL RES. USA, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE EAST 12 INCH SOUR GAS PIPELINE, EAGLEVILLE (EAGLE FORD-1) FIELD, LA SALLE COUNTY, TEXAS.
01-0285156
PFD
ORDER
APPLICATION OF PIONEER NATURAL RES. USA, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE NORTH 16 INCH SOUR GAS PIPELINE, EAGLEVILLE (EAGLE FORD-1) FIELD, LA SALLE COUNTY, TEXAS.
01-0285614
PFD
ORDER
APPLICATION OF ACCESS MLP OPERATING LLC TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, WHITETAIL DILLEY INTERCONNECT, ZAVALA COUNTY, TEXAS.
01-0286049
PFD
ORDER
APPLICATION OF EOG RESOURCES, INC., TO CONSTRUCT A SOUR GAS PIPELINE, PEELER GATHERING SYSTEM, ATASCOSA AND MCMULLEN COUNTIES, TEXAS.
01-0287703
PFD & ATTACH 
ORDER
APPLICATION OF ACCESS MLP OPERATING LLC TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, FAUST INTERCONNECT, DIMMITT COUNTY, TEXAS.
01-0287606
PFD & ATTACH
ORDER
APPLICATION OF PIONEER NATURAL RES. USA, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE WASHBURN 02-10, 11, 12, AND 13H, 8-INCH SOUR GAS PIPELINE, LA SALLE COUNTY, TEXAS.
01-0287607
PFD & ATTACH
ORDER
APPLICATION OF PIONEER NATURAL RES. USA, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE WASHBURN 02-14, 15, 16, AND 17H, 8-INCH SOUR GAS PIPELINE, LA SALLE COUNTY, TEXAS.
01-0287608
PFD & ATTACH
ORDER
ORDER-NPT
ORDER-NPT2

APPLICATION OF PIONEER NATURAL RES. USA, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE WASHBURN 01-08, 09, 10, AND 11H, 8-INCH SOUR GAS PIPELINE, LA SALLE COUNTY, TEXAS.
01-0288167
PFD
ORDER
APPLICATION OF FRIO LASALLE PIPELINE, LP TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, 10-INCH EP SOUR DISCHARGE, LA SALLE COUNTY, TEXAS.
01-0288168
PFD
ORDER
APPLICATION OF FRIO LASALLE PIPELINE, LP TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, 20-INCH VWT GATHERING SOUTH, LA SALLE COUNTY, TEXAS.
01-0289887
PFD
ORDER
APPLICATION OF MURPHY EXPLORATION & PRODUCTION CO. TO CONSTRUCT AND OPERATE A SOUR GAS PIPELINE, THE MOURSUND PIPELINE, EAGLEVILLE (EAGLE FORD-1) FIELD, ATASCOSA COUNTY, TEXAS.
01-0289886
PFD
ORDER
APPLICATION OF ACCESS MLP OP, L.L.C. TO CONSTRUCT A HYDROGEN-SULFIDE GAS PIPELINE, PURSUANT TO 16 TAC §§3.36, 3.70 AND 3.106, 10-3/4" FAUST INTERCONNECT EXTENSION, DIMMITT COUNTY, TEXAS.
01-0294628
PFD
ORDER
APPLICATION OF ACCESS MLP OPERATING LLC (P-5 OPERATOR NO. 003389) TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, THE 16-INCH TRUNKLINE, DILLEY RANCH GAS GATHERING SYSTEM, LA SALLE COUNTY, TEXAS.
01-0294629
PFD
ORDER
APPLICATION OF ACCESS MLP OPERATING LLC TO CONSTRUCT A SOUR GAS PIPELINE, HEAVY CF DISCHARGE PIPELINE, DILLEY GAS GATHERING SYSTEM, LA SALLE COUNTY, TEXAS.
01-0294630
PFD
ORDER
APPLICATION OF ACCESS MLP OPERATING LLC TO CONSTRUCT A SOUR GAS PIPELINE, PALOMINO LATERAL LOOP, DILLEY GAS GATHERING SYSTEM, LA SALLE COUNTY, TEXAS.
01-0296797
PFD
ORDER
APPLICATION OF EOG RESOURCES INC. (P-5 OPERATOR NO. 253162) TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, THE PEELER GATHERING SYSTEM, EAGLEVILLE (EAGLE FORD-1) FIELD, ATASCOSA AND MCMULLEN COUNTIES, TEXAS.
01-0298000
PFD
ORDER

APPLICATION OF FRIO LASALLE PIPELINE, LP (FLP) TO CONSTRUCT A SOUR GAS PIPELINE, CABOT HP DISCHARGE PIPELINE, LANCASTER SYSTEM, FRIO COUNTY, TEXAS.

01-0298891
PFD
ORDER 
APPLICATION OF WILLIAMS MLP OPERATING, LLC TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO STATEWIDE RULE 106 FOR THE DIAMONDBACK GGS / MUTZ INTERCONNECT, DIAMONDBACK GGS AREA, EAGLEVILLE (EAGLE FORD-1) FIELD, ATASCOSA AND MCMULLEN COUNTIES, TEXAS.
01-0300227
PFD
ORDER
APPLICATION OF EOG RESOURCES, INC. TO CONSIDER AUTHORITY PRUSUANT TO STATEIWDE RULE 106 FOR A PERMIT TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, EAGLEVILLE (EAGLE FORD-1) FIELD, ATASCOSA COUNTY, TEXAS.
01-0300842
PFD
ORDER
APPLICATION OF WILLIAMS MLP OPERATING LLC, TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO RULE 106, DIAMONDBACK GGS/THELMA TO PEELER TRUNKLINE, EAGLEVILLE (EAGLE FORD-1) FIELD, MCMULLEN COUNTY, TEXAS.   
01-0300843
PFD
ORDER
APPLICATION OF WILLIAMS MLP OPERATING LLC, TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO RULE 106, DIAMONDBACK GGS/FOUR K TO MUTZ LOOP, EAGLEVILLE (EAGLE FORD-1) (27135700) FIELD, ATASCOSA AND MCMULLEN COUNTIES, TEXAS.  
01-0300845
PFD
ORDER
APPLICATION OF WILLIAMS MLP OPERATING LLC, TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO RULE 106, LOCKE LATERAL, EAGLEVILLE (EAGLE FORD-1) (27135700) FIELD, MCMULLEN COUNTY, TEXAS.
01-0301600
ORDER ONLY

APPLICATION OF CHESAPEAKE OPERATING, L.L.C. TO CONSTRUCT A SOUR GAS PIPELINE, PURSUANT TO 16 TAC §3.106, COUNTISS I LATERAL, EAGLEVILLE (EAGLE FORD-1) FIELD, MCMULLEN COUNTY, TEXAS.

01-0301686
ORDER ONLY

APPLICATION OF CHESAPEAKE OPERATING, L.L.C. TO CONSTRUCT A SOUR GAS PIPELINE, PURSUANT TO 16 TAC §3.106, LEDWIG EAST E LATERAL, EAGLEVILLE (EAGLE FORD-1) FIELD, LA SALLE COUNTY, TEXAS.

01-0301710
PFD 
ORDER
APPLICATION OF WILLIAMS MLP OPERATING, LLC PURSUANT TO SWR 106 FOR A PERMIT TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, BURNS DILLEY LATERAL/DILLEY RICH GGS, EAGLEVILLE (EAGLE FORD-1) FIELD, LA SALLE COUNTY, TEXAS.
01-0301762
PFD
ORDER
APPLICATION OF WILLIAMS MLP OPERATING, LLC PURSUANT TO SWR 106 FOR A PERMIT TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, DIAMONDBACK GGS/MIDDLE EARTH TRUNKLINE, EAGLEVILLE (EAGLE FORD-1) FIELD, MCMULLEN COUNTY, TEXAS.
01-0302387
ORDER
APPLICATION OF WILLIAMS MLP OPERATING, LLC TO CONSIDER AUTHORITY PURSUANT TO SWR 106 FOR A PERMIT TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, THE DILLY RICH GGS/VALLEY WELLS LATERAL EXTENSION, DIMMIT COUNTY, TEXAS.
01-0302464
ORDER
APPLICATION OF WILLIAMS MLP OPERATING, LLC TO CONSIDER AUTHORITY PURSUANT TO SWR 106 FOR A PERMIT TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, THE DILLY RICH GGS/ROGERS HEAVY TRUNKLINE, DIMMIT AND LA SALLE COUNTIES, TEXAS.
 01-0302952
ORDER
APPLICATION OF WILLIAMS MLP OPERATING LLC FOR A SOUR GAS PIPELINE PURSUANT TO STATEWIDE RULE 106 FOX CREEK GCS/ LAS COMPADRES LATERAL PIPELINE MCMULLEN COUNTY, TEXAS. 
01-0303538
ORDER
APPLICATION OF CML EXPLORATION, LLC TO CONSIDER A SOUR-GAS PIPELINE PERMIT APPLICATION FOR THE ZAVALA AMINE PLANT, PENA CREEK FIELD, ZAVALA AND DIMMIT COUNTIES, TEXAS.
   
DISTRICT 02

 
   
02-0273418
PFD
ORDER
APPLICATION OF EOG RESOURCES, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE PURSUANT TO STATEWIDE RULE 106, EOG TO REGENCY PIPELINE, EAGLEVILLE (EAGLE FORD-2) FIELD, KARNES AND WILSON COUNTIES, TEXAS.
02-0325621
ORDER ONLY
APPLICATION OF ENERGY TRANSFER COMPANY TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO STATEWIDE RULE 106 FOR THE RECOIL RESOURCES PIPELINE, SOUTH TEXAS (PANA MARIA) AREA, KARNES COUNTY, TEXAS
   
DISTRICT 03

 
03-0304582
ORDER ONLY
APPLICATION OF VOPAK MODA HOUSTON, LLC TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO STATEWIDE RULE 106, VOPAK MODA HOUSTON LINE NO. 2, PASADENA/DEER PARK AREA HARRIS COUNTY, TEXAS.
   
DISTRICT 04

 
04-0249913
PFD
ORDER
APPLICATION OF REGENCY FS LP TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, THE GATES LATERAL EXTENSION, WEBB COUNTY, TEXAS.
   
DISTRICT 05

 
05-0242975
PFD
ORDER

APPLICATION OF XTO ENERGY INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, AN EXTENSION OF THE TEAGUE SOUR GAS GATHERING SYSTEM, THE N.E. TEAGUE 8" LOOP LINE, FREESTONE COUNTY, TEXAS.

05-0243021
PFD
ORDER
APPLICATION OF XTO ENERGY INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, AN EXTENSION OF THE OAKS SOUR GAS GATHERING SYSTEM, THE H.D. THOMAS #4 TO HUDSON B #10, 10-INCH LINE, LIMESTONE COUNTY, TEXAS.
05-0243050
PFD
ORDER
APPLICATION OF XTO ENERGY INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, AN EXTENSION OF THE TEAGUE SOUR GAS GATHERING SYSTEM, THE BUTLER #8 TO CURRY #1, 12-INCH LINE, FREESTONE COUNTY, TEXAS.
05-0249904
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LP TO CONSTRUCT AND OPERATE HYDROGEN SULPHIDE GAS PIPELINES, EXTENSIONS OF THE TEAGUE SOUR GAS GATHERING SYSTEM, THE DUNLAP TO DAY EXTENSIONS, FREESTONE COUNTY, TEXAS.
05-0250370
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, AN EXTENSION OF THE TEAGUE SOUR GAS GATHERING SYSTEM, THE IRVIN XTENSION, FREESTONE COUNTY, TEXAS.

05-0262945
PFD
ORDER

APPLICATION OF TREND GATHERING & TREATING, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE EXTENSION, FREESTONE COUNTY, TEXAS.
05-0267555
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, IVY TO BOOTH 10", TEAGUE FIELD, FREESTONE COUNTY, TEXAS.
05-0269800
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, 8" ORAND “A” HEADER TO WILLARD 1-3 COMPRESSOR, TEAGUE FIELD, FREESTONE COUNTY, TEXAS.
05-0274316
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE KING SOUR SECTION 8" DISCHARGE PIPELINE, SOUR BEAR GRASS GAS GATHERING SYSTEM, BEAR GRASS FIELD, LEON COUNTY, TEXAS.
05-0276503
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, 8-INCH ORAND “A” 7 TO ORAND “A” 2, NORTH REED GATHERING SYSTEM, FREESTONE COUNTY, TEXAS.
05-0278041
PFD
PFD-ATTACH
ORDER
APPLICATION OF TREND GATHERING & TREATING, LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, 8" KENNEDY ROAD TO HUNTER #7 WELL SITE, SOUR BEAR GRASS FIELD, LEON COUNTY, TEXAS.
05-0279178
PFD
ORDER

APPLICATION OF TREND GATHERING & TREATING, LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, KING COMPRESSOR STATION TO HUNTER MAINLINE, BEAR GRASS FIELD, LEON COUNTY, TEXAS.

05-0280301
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, GAIL KING LEASE, WELL NO. 6, TO KING COMPRESSOR STATION, BEAR GRASS FIELD, LEON COUNTY, TEXAS.
05-0282684
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING, LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, 8-INCH HUNTER EXTENSION SOUR BEAR GRASS GATHERING SYSTEM, LEON COUNTY, TEXAS.
05-0293956
PFD
ORDER
APPLICATION OF TREND GATHERING & TREATING TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, THE 12-INCH KING SOUR STATION TO WATSON CP, BEAR GRASS FIELD, LEON COUNTY, TEXAS.
05-0319086
ORDER
APPLICATION OF KUDU MIDSTREAM LLC (478441) TO CONSIDER SOUR GAS PIPELINE PURSUANT TO 16 TAC §3.106 FOR THE GOLF LAKE GATHERING 16 TO PLANT LINE, BALD PRAIRIE (CV CONSOLIDATED) AREA, ROBERTSON COUNTY, TEXAS
05-0319087
ORDER
APPLICATION OF KUDU MIDSTREAM LLC (478441) TO CONSIDER SOUR GAS PIPELINE PURSUANT TO 16 TAC §3.106 FOR THE GOLD LAKE #1 TO ENBRIDGE 6 LINE, BALD PRAIRIE (CV CONSOLIDATED) AREA, ROBERTSON COUNTY, TEXAS
05-0319089
ORDER
APPLICATION OF KUDU MIDSTREAM LLC (478441) TO CONSIDER SOUR GAS PIPELINE PURSUANT TO 16 TAC §3.106 FOR THE CURRIE #1 TO PLANT LINE, BALD PRAIRIE (CV CONSOLIDATED) AREA, ROBERTSON COUNTY, TEXAS
   
DISTRICT 06

 
   
DISTRICT 7C

 

7C-0249067
PFD
ORDER

APPLICATION OF ARLEDGE GAS GATHERING, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, THE ARLEDGE RANCH FACILITY, CROCKETT AND VAL VERDE COUNTIES, TEXAS.
7C-0262604
PFD
ORDER
APPLICATION OF TARGA PERMIAN LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, BLOCK 42 COMPRESSOR STATION TO RAILWAY RANCH COMPRESSOR STATION, SAND HILLS FIELD, UPTON COUNTY, TEXAS.
   
DISTRICT 08

 
08-0247391
PFD
ORDER
APPLICATION OF DUKE ENERGY FIELD SERVICES TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, THE WEST WADDELL “WW” PIPELINE, ECTOR AND CRANE COUNTIES, TEXAS.

08-0249072
PFD
ORDER

APPLICATION OF SOUTHERN UNION GAS SERVICES, LTD TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, KEYSTONE SYSTEM, JAL # 3 TO KEYSTONE TRANSFER LINE, WINKLER COUNTY, TEXAS.

08-0252197
PFD
ORDER

APPLICATION OF TRAIL MOUNTAIN, INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULPHIDE GAS PIPELINE, THE UNIVERSITY GATHERING SYSTEM, HUDSPETH COUNTY, TEXAS.

08-0257013
PFD
ORDER

APPLICATION OF WHITING OIL AND GAS CORPORATION TO CONSTRUCT AND OPERATE A 10 INCH AND 20 INCH HYDROGEN SULFIDE PIPELINE EXTENSION, WICKETT SOUR CO2 PIPELINE, WARD COUNTY, TEXAS.
08-0267229
PFD
ORDER
APPLICATION OF DCP MIDSTREAM, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, ANDREWS AND GAINES COUNTIES, TEXAS.
08-0267230
PFD
ORDER
APPLICATION OF DCP MIDSTREAM, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, ECTOR COUNTY, TEXAS.
08-0267873
PFD
ORDER
APPLICATION OF DCP MIDSTREAM, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS GATHERING PIPELINE, FULLERTON 12" SOUTH LOOP, ANDREWS COUNTY, TEXAS.
08-0270863
PFD
ORDER

APPLICATION OF DCP MIDSTREAM, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS GATHERING PIPELINE, FULLERTON 8" BLOCK 7 TO MEANS DISCHARGE, ANDREWS COUNTY, TEXAS.

08-0280125
PFD
ORDER
APPLICATION OF DCP MIDSTREAM, LP TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, U LOOP 2 PIPELINE, GOLDSMITH FIELD, ECTOR COUNTY, TEXAS.
08-0286879
PFD
ORDER
APPLICATION OF JAMES LAKE MIDSTREAM LLC TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, COTTONWOOD LATERAL GATHERING SYSTEM, ECTOR COUNTY, TEXAS.
08-0287419
PFD & ATTACH
ORDER
APPLICATION OF JAMES LAKE MIDSTREAM LLC TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, JAMES LAKE GATHERING SYSTEM, ANDREWS/GOLDSMITH AREA, ANDREWS AND ECTOR COUNTIES, TEXAS.
08-0290020
PFD
ORDER
APPLICATION OF DCP MIDSTREAM, LP TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, THE 12-INCH GF PIPELINE (GOLDSMITH TO FULLERTON), ECTOR AND ANDREWS COUNTIES, TEXAS.
08-0294516
PFD
ORDER
APPLICATION OF DCP MIDSTREAM LP TO REPLACE AND OPERATE AN EXISTING 20 INCH POLY J-1 CHAPEL HILL DISCHARGE LINE  (CH-1) WITH A STEEL 16 INCH SOUR GAS LINE,  ECTOR COUNTY, TEXAS.
08-0294516
PFD
ORDER

APPLICATION OF JAMES LAKE MIDSTREAM, L.L.C. TO CONSIDER AUTHORITY PURSUANT TO 16 TAC §3.106 FOR A PERMIT TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, WINKLER GATHERING SYSTEM, KERMIT FIELD AREA, ECTOR AND WINKLER COUNTIES, TEXAS.

08-0300304
PFD
ORDER
APPLICATION OF JAMES LAKE MIDSTREAM, LLC TO CONSIDER AUTHORITY PURSUANT TO 16 TAC §3.106 FOR A PERMIT TO CONSTRUCT AND OPERATE A SOUR GAS PIPELINE, ELEVATION EXTENSION FACILITY, BLOCK 1 AREAANDREWS COUNTY, TEXAS.
08-0303220
ORDER
APPLICATION OF ENERGY TRANSFER COMPANY TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO STATEWIDE RULE 106, WAHA TO ARROWHEAD 24 INCH, WAHA, WEST (DELAWARE) FIELD, REEVES AND PECOS COUNTIES, TEXAS. 
08-0318388
ORDER - Only
APR OPERATING LLC (028612) PURSUANT TO STATEWIDE RULE 106 APPLICATION FOR A PERMIT TO CONSTRUCT A SOUR GAS PIPELINE FACILITY, MAVERICK SOUR GAS GATHERING SYSTEM LEASE, CULBERSON AND REEVES COUNTIES, TEXAS 
   
DISTRICT 8A

 

8A-0255214
PFD
ORDER

APPLICATION OF XTO ENERGY INC. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, CORNELL-MAHONEY AREA, WASSON FIELD, YOAKUM COUNTY, TEXAS.
8A-0268784
PFD
ORDER
APPLICATION OF KINDER MORGAN PRODUCTION COMPANY, LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, COGDELL 24" GAS GATHERING LINE, SCURRY COUNTY, TEXAS.
8A-0278132
PFD
PFD-ATTACH
ORDER
APPLICATION OF OCCIDENTAL PERMIAN LTD. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE BENNETT RANCH TO WILLARD PLANT LATERAL, WASSON FIELD, YOAKUM COUNTY, TEXAS.
8A-0278134
PFD
PFD-ATTACH
ORDER
APPLICATION OF OCCIDENTAL PERMIAN LTD. TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, THE WILLARD PLANT TO BENNETT RANCH RETURN LATERAL, WASSON FIELD, YOAKUM COUNTY, TEXAS.
8A-0279418
PFD
ORDER
APPLICATION OF TARGA MIDSTREAM RESOURCES, LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS PIPELINE, XTO MONUMENT INTERCONNECT PIPELINE, CORNELL FIELD, GAINES COUNTY, TEXAS.
8A-0287041
PFD & ATTACH
ORDER
APPLICATION OF OCCIDENTAL PERMIAN LTD. TO CONSTRUCT AND OPERATE A SOUR GAS PIPELINE, LEVELLAND LOOP LINE, LEVELLAND FIELD, HOCKLEY COUNTY, TEXAS.
8A-0294514
PFD
ORDER
ORDER-NPT
APPLICATION OF KINDER MORGAN PRODUCTION CO. LLC TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO RULE 106, REINECKE PIPELINE, SACROC UNIT, KELLY-SNYDER FIELD, BORDEN AND SCURRY COUNTIES, TEXAS.
8A-0294515
PFD
ORDER
APPLICATION OF OCCIDENTAL PERMIAN LTD (P-5 OPERATOR NO. (617544) TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, THE DENVER UNIT 24-INCH VALVE STATION NO. 2 TO WEST COMPRESSOR STATION PIPELINE, GAINES AND YOAKUM COUNTIES, TEXAS.
8A-0300544
PFD
ORDER
APPROVING THE APPLICATION OF OCCIDENTAL PERMIAN LTD, TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO RULE 106, LEVELLAND LOOP LINE, LEVELLAND FIELD, HOCKELY COUNTY, TEXAS.
8A-0300661
PFD
ORDER
APPLICATION OF BRAVO PIPELINE COMPANY TO CONSIDER A SOUR-GAS PIPELINE PERMIT APPLICATION FOR THE SUNDOWN UNIT CO2 SUPPLY LINE, SLAUGHTER FIELD, HOCKLEY COUNTY, TEXAS.
8A-0307897
ORDER
APPLICATION OF SANTA FE MIDSTREAM PERMIAN LLC TO CONSIDER A SOUR GAS PIPELINE PURSUANT TO STATEWIDE RULE 106 FOR THE DOUBLE DOWN GAS GATHERING SYSTEM, PERMIAN BASIN FIELD AREA, YOAKUM COUNTY, TEXAS.
 8A-0308721
ORDER
APPLICATION OF KINDER MORGAN PRODUCTION CO LLC (P-5 OPERATOR NO. 463316) TO CONSTRUCT AND OPERATE A HYDROGEN-SULFIDE GAS PIPELINE, THE TALL COTTON PROJECT SOUR CO2 GATHERING AND INJECTION SYSTEM, TALL COTTON (SAN ANDRES) FIELD, GAINES COUNTY, TEXAS.
DISTRICT 09

 
   

DISTRICT 10

 
10-0263739
PFD
ORDER
APPLICATION OF BIG C GATHERING, LLC TO CONSTRUCT AND OPERATE A HYDROGEN SULFIDE GAS GATHERING PIPELINE, WAYMOBETTA NO. 43-1 SYSTEM, WHEELER COUNTY, TEXAS.