This Injection/Disposal Well Permitting, Testing, and Monitoring Manual is to be used for informational and instructional purposes only and is not to be regarded as a detailed study of underground injection practices and procedures.
The intent of this manual is to outline the basic compliance and reporting requirements to be met by oil and gas operators engaged in underground injection operations. Operators should consult the appropriate rules for more specific or detailed information. In addition, the staff of the Railroad Commission is available to answer questions and provide assistance.
The Railroad Commission has Primacy Enforcement Authority for the Underground Injection Control (UIC) program for Class II wells and Class III brine mining wells. This manual’s contents can be accessed through the links below.